Lopez, J. P.
Juan P. Lopez is a Senior Process Safety Engineer at Bechtel. He has more than 10 yr of experience in process safety, including designing emergency relief systems and participating in process hazard analyses. Lopez earned a BS degree in chemical engineering from Texas A&M University and is a registered professional engineer in the State of Texas.
A simplified dynamic approach for storage tank thermal inbreathing rates
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
Storage tanks that experience sudden heavy rain on what was a hot sunny day can be damaged due to inadequate venting devices.
Use a simple vapor equation for sizing two-phase pressure relief valves
Pressure relief valves (PRVs) protect process equipment from the hazards of excessive over-pressure.
Vapor velocity guidelines for horizontal flare knockout drums
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
Flare knockout (KO) drums are important components of effluent handling systems.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BPCL and National Sugar Institute collaborate to advance sweet sorghum as a sustainable biofuel source 2/21
- Resynergi secures $18 MM to accelerate plastic recycling innovation 2/21
- LiqTech receives supplier approval for water treatment system for WinGD dual-fuel engine 2/21
- Japan's Eneos shuts 141,000-bpd Sakai CDU after a fire 2/21
- Russia's idle oil refining capacity estimated 82% up in February 2/21
- U.S. refiners mull switch to alternative lighter crudes amid Trump tariff fears 2/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction