Tiwari, V. K.
Vijay Kumar Tiwari is an Engineering Group Supervisor (Process Lead) at Bechtel India Pvt. Ltd. He has more than 18 yr of professional expertise in process design, development, engineering and management, and possesses extensive experience in managing petrochemical projects on a global scale. He earned his BTech degree in chemical engineering from the Indian Institute of Technology (IIT) in Delhi, India. His previous roles included positions at Toyo Engineering Korea and Engineers India Ltd.
Pellet handling system for polyolefin plants: Are you specifying it correctly?
Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Ethylene
/ Loss Prevention
/ Motors
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Storage
/ Valves
/ Olefins
Product pellets produced in polyolefin plants—such as polyethylene (PE) or polypropylene (PP)—require transportation from the unit to the end users that process these pellets to manufacture different end-use plastic products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction