Gim, S.
Steve Gim is the Regional Technical Service Manager for BASF. He has more than 25 yr of experience in the refining industry, with roles encompassing catalyst selection, FCC process design and startups, modeling and refinery planning. Prior to joining BASF, he was the Principal Technologist for Technip Stone & Webster and a trading analyst for Enron and Reliant. A CFA® charter holder, Gim earned a BS degree in chemical engineering from the University of Texas and an MBA degree from Rice University.
How digitalization is turning data into value in the heart of the refinery: FCC catalysts
Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Products
/ Reactors
/ Americas
Digitalization has impacted the world of refining for the past several decades.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction