Felipe, M. J.
Mary Jane Felipe is a research scientist at Baker Hughes, where she helps develop new technologies for oil and gas industry applications. Dr. Felipe was previously a chemistry instructor and researcher at the University of the Philippines and part of a regional task force for the UN Development Program. She has experience in synthetic organic chemistry, materials chemistry and surface chemistry for oil and gas and homecare applications. Dr. Felipe holds six patent-pending applications and has authored or co-authored more than 50 papers. She received her PhD in chemistry from the University of Houston.
Non-phosphorus corrosion inhibitor optimizes cooling tower uptime for environmental compliance
Cooling water systems play a critical role in the efficient operation of hydrocarbon processing facilities.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction