Guesneux, S.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

