Pongboot, N.
Nattapong Pongboot is a chemical engineer with hands-on experience in refining and petrochemical technologies as both licensor and refiner. He is currently a Project Leader under the Refinery Catalyst Testing group at Avantium Catalysis, delivering high-quality catalyst testing services for customers worldwide. He holds an M.Eng. degree in chemical engineering from Kasetsart University. The author can be reached at Nattapong.Pongboot@avantium.com and Nat.Pongboot@gmail.com.
Select the right capacity control technique for centrifugal compressors: Refinery case studies
The centrifugal compressor has been the workhorse of the oil and gas industry for decades.
Refinery catalyst selection: Facts and fictions every refiner should know
Most refiners carefully evaluate their refining catalysts to ensure maximum benefits over the catalyst cycle length.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction