Beautyman, A. C.
Consider model-based inferential properties for reformers
Process Control
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Middle East
A European refiner opts to apply embedded multivariable predictive controllers as part of an advanced process control system
Assessing profitability of real-time optimization
Perform these pre- and post-project audits
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: A unified approach to methane emissions reporting (3) 2/4
- Borouge achieved a 24% increase in net profit in 2024, reaching $1.24 B 2/4
- Sasol, Anglo American and De Beers to pilot renewable diesel in South Africa 2/4
- Singapore Airlines Group, Aether Fuels sign MoU for SAF 2/4
- Thailand to import more U.S. ethane to reduce trade surplus 2/4
- China tariff retaliation targets its modest U.S. energy imports 2/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction