Dyment, J.
Jennifer Dyment is a member of AspenTech’s product team. She advises oil, gas and petrochemical customers on how to meet operational challenges with AspenTech’s aspenONE Engineering solutions. Ms. Dyment’s background is in chemical engineering. She is a graduate of the Thayer School of Engineering at Dartmouth College.
Optimizing the dehydration process with advanced process simulation
Gas Processing/LNG
/ Acid Gas Removal
/ Aromatics
/ Boilers
/ Process Optimization
/ Engineering & Design
/ Environment
/ Loss Prevention
/ Natural Gas
/ Safety
/ Treating
In the operation of natural gas pipelines, a blockage or leak can cause expensive production losses, damage equipment and pose safety hazards.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Saudi Arabia was top buyer of Russian fuel oil and VGO in November 12/23
- Digital Exclusive (sponsored): NXRe™: A novel recycling technology to support the plastics industry in creating efficient and effective circular value chains 12/22
- Portugal's Galp plans to start producing biofuels in 2026 12/20
- Prax and Shell call off deal on stake in PCK Schwedt oil refinery 12/20
- Nigeria's Dangote Refinery hits 85% refining capacity 12/20
- India's BPCL buys first Argentinian crude oil cargo for Feb. delivery 12/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction