Sivasubramanian, G.
Gopi Sivasubramanian is a Principal Consultant with Arivergy LLC. He has 24 yr of industry experience, most of it with Foster Wheeler and Engineers India Ltd. Mr. Sivasubramanian’s extensive career has included process design, technology and engineering expertise in areas of crude and vacuum distillation, hydroprocessing, hydrogen and sour water stripping/amine treating. His specialties include process design packages, revamp design and engineering, optimization, consulting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BPCL and National Sugar Institute collaborate to advance sweet sorghum as a sustainable biofuel source 2/21
- Resynergi secures $18 MM to accelerate plastic recycling innovation 2/21
- LiqTech receives supplier approval for water treatment system for WinGD dual-fuel engine 2/21
- Japan's Eneos shuts 141,000-bpd Sakai CDU after a fire 2/21
- Russia's idle oil refining capacity estimated 82% up in February 2/21
- U.S. refiners mull switch to alternative lighter crudes amid Trump tariff fears 2/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction