Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ketjen announces pricing adjustment for hydroprocessing catalysts effective January 15, 2026 1/9
- Germany's Uniper nears agreement to buy green ammonia from India 1/9
- Digital Exclusive—Valve maintenance: An open and shut case? 1/9
- Serbia's Russian-owned NIS refiner buys first crude since U.S. sanctions waiver 1/9
- U.S. refiner Marathon Petroleum says it will be bidding for Venezuelan crude oil 1/9
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

