Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

