Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ketjen announces pricing adjustment for hydroprocessing catalysts effective January 15, 2026 1/9
- Germany's Uniper nears agreement to buy green ammonia from India 1/9
- Digital Exclusive—Valve maintenance: An open and shut case? 1/9
- Serbia's Russian-owned NIS refiner buys first crude since U.S. sanctions waiver 1/9
- U.S. refiner Marathon Petroleum says it will be bidding for Venezuelan crude oil 1/9
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

