Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

