Shah, K.
Minimize risks from cryogenic exposure on LNG facilities
A rational approach investigates methods to protect equipment and infrastructure from liquefied natural gas releases
Improve process control in gas plants using tunable diode laser spectroscopy
This analyzer technology is replacing conventional sensors to improve the bottom line
Improve gas interchangeability for LNG terminals
Quality issues on imported natural gas will require more processing at receiving sites
Simple techniques for generating process control inferentials
Property estimation can be done with easy statistical tools and spreadsheet software
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction