Fischbach, A.
Andrew Fischbach is the Technical Sales Support Specialist for Aggreko.
Optimization: Plan before main air blower disaster strikes
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Compressors
/ Equipment
/ Loss Prevention
/ Management
/ Safety
/ Americas
Weeks before a planned overhaul of its coker unit, a synthetic crude plant’s main air blower for the furnace failed, throwing the engineers’ plans into disarray.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
- U.S. liquid fuels groups announce progress on E15, small refinery exemption reform 12/5
- Million Air and Avfuel bring SAF to Austin, Texas (U.S.) 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

