Zhan, B.-Z.
Bi-Zeng Zhan is an ART/CLG Hydrocracking R&D Manager working in the Chevron Technology Center office in Richmond, California. He joined ART/CLG in 2018. Dr. Zhan has more than 15 yr of experience in refining industry R&D and has held several roles at the Chevron Research Center. He earned his PhD in chemistry from the Hong Kong University of Science and Technology, and has more than 40 publications in peer-reviewed journals and has been granted more than 20 U.S. patents.
Partners maximize profitability during the pandemic
The COVID-19 pandemic can be viewed as one of the most challenging periods in the history of the oil and gas sector. Refineries worldwide faced difficult times operating at their turndown capacities or even temporarily shut down units at the refinery.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction