Fisher, P.
Monitor safety with improved risk performance indicators
Environment & Safety
/ Process Control
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
Using Layer of Protection Analysis (LOPA) and real-time operational data, statistical estimates of the frequencies of future hazardous events can be generated. Combined with a qualitative estimate of the severity of hazardous events and the tolerable frequency determined in the LOPA, an objective leading metric of hazardous events can be created.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

