Musharfy, M.
Mohamed Al Musharfy has more than 13 years of multidisciplinary experience in planning, coordination, business studies and development in the field of refining. He works as the Manager of engineering R&D at the TAKREER Research Centre, and he earned a BS degree in chemical engineering from the United Arab Emirates University.
Simulation for the prevention of hydrates during FCC gas processing
In the last decade, maximizing refinery production of polymer-grade propylene (PGP) has gained importance due to high demand from the petrochemical industry.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction